O
New Bern, NC
← New Bern, NC

New Bern · issues

Civic issues

Topics getting the most attention in New Bern, NC public meetings, ranked by how frequently they come up.

12 issues (filtered)14 topics
HighGeneral

Epiphany School special-use permit (TK facility)

A private school wants to run a transitional kindergarten facility on a small residentially-zoned lot at 2211 Henderson Avenue. The special use permit decision affects what can operate in that R-6 neighborhood and how nearby residents are protected by conditions.

6 mentions (1 this month)Last discussed Oct 22, 2026
HighGeneral

Rezoning of 1100 Pinetree Drive

A nonprofit that trains service dogs for veterans wanted C-3 commercial zoning on 3.87 acres, but the Planning Board and land use plan said no. The Board denied it as filed but unanimously ordered a text amendment so a C-5 version can come back in two to four months.

7 mentions (1 this month)Last discussed Oct 22, 2026
HighGovernance

Updates to Historic District Design Principles and Standards

The Riverside Historic District inventory is 38 years old, leaving 70-80 eligible structures unprotected from demolition. The board authorized a CLG grant application, and staff continues revising HPC guidelines toward a July target.

18 mentions (1 this month)Last discussed Oct 21, 2026
HighZoning

Certificates of Appropriateness for Three Historic Properties

Property owners in the historic districts need a certificate of appropriateness before changing building exteriors. This batch covers porches, decks, sunscreens, an outdoor bar, and two demolition-and-rebuild infill houses.

5 mentions (1 this month)Last discussed Oct 21, 2026
HighZoning

Clarifying and Revising Purchasing Conditions for Salable Lots

The Property Sales and Marketing workgroups were to discuss revising purchasing conditions and adding signage to lots the city wants to sell.

5 mentions (1 this month)Last discussed Oct 14, 2026
HighDevelopment

Disposition of Redevelopment Parcels (First Avenue, Mechanic Street, Bloomfield Street, Sampson Street)

The commission was scheduled to consider bids from two buyers for four vacant lots in the redevelopment area. Selling these parcels could put them back on the tax rolls and into productive use, but the outcome of the vote is unknown.

6 mentions (1 this month)Last discussed Oct 14, 2026
HighDevelopment

Weyerhaeuser Rezoning and Development Agreement

A resolution was scheduled to call a public hearing on rezoning three Weyerhaeuser parcels — one to commercial, two to R-6 residential — and to approve a development agreement with Weyerhaeuser NR Company. This could set the stage for significant new growth.

1 mention (1 this month)Last discussed Oct 13, 2026
HighWater Utilities

FY27 Water and Sewer Improvements Project

A contract with Avolis Land Works, LLC was scheduled for the FY27 water and sewer improvements project — infrastructure work that keeps taps and flushes running reliably.

1 mention (1 this month)Last discussed Oct 13, 2026
HighZoning

C-3 Commercial Rezoning of Two Agricultural Parcels

The board was scheduled to hold a public hearing and possibly adopt a rezoning of Tax Parcel IDs 8-210-044 and 8-210-23001 from agricultural to commercial use. What gets built there could shape traffic and neighborhood character.

1 mention (1 this month)Last discussed Oct 13, 2026
HighZoning

Initial zoning of US 70 parcels as Commercial 3

Two newly annexed parcels totaling 5.86 acres along East US 70 would be zoned Commercial 3 (C-3), opening the door to commercial development on the highway corridor. What gets built there depends on this designation and later approvals.

2 mentions (1 this month)Last discussed Oct 13, 2026
HighDevelopment

Demolition by neglect at 221 E. Front St.

A downtown building has been in demolition-by-neglect status since the 1990s. Slow but steady repairs continue — windows, roof covering, and a rebuilt two-story porch — with a repointing application expected soon.

2 mentions (1 this month)Last discussed Oct 7, 2026
HighDevelopment

Long-running demolition by neglect at 221 E. Front St.

One of the city's longest-running demolition-by-neglect cases, dating back to the 1990s or earlier. The update notes real progress: windows repaired and reinstalled, temporary roof covering along the parapet, and a two-story wood porch being rebuilt with exact replacement — plus a repointing COA application coming soon.

3 mentions (1 this month)Last discussed Oct 7, 2026